OUR ORO GOLD MINE 75 MILES SW OF TUCSON ARIZONA
Goodmark Capital Group, Inc. (2017-2018 UPDATE): Assay and gravity concentration test of our now claimed Oro Gold Mine extended areas. (click on link and friend us on facebkook to see our latest project development photos)–> GoodMark Capital Group, Inc. has now claimed up 108 Claims total including our origional Oro Gold Mine and newly acquired extended area plus our Sulfide Claims to the north (Previously Known As The Idaho Mine Group) and The Choctaw Mine. (NEW TOTAL CLAIMS ACERAGE IS AS FOLLOWS: 2,189.96+15.75+18.06=2,22
Click on the links below to show our test results, new claim information, location maps and photographs etc. 1. Assay Report to Mark-1 5-27-17-r , 2. Platt Maps For Claims, 3. Numbered Claim Block Diagram , 4. Topographical Claim Block Map , 5. Our First Mill Under Construction Of The Two To Be Built This Year We Have Purchased , 6. Collage
MINE SITE 1: GoodMark Capital Group, Inc. has 108 claims Total in our Oro Gold Mine, Sulfide Gold Mine And Choctaw Gold Mine in southern Arizona. We hold the mineral rights to 2,22
($100M +/- gold reserves rotary drill core sample verified; sample procedures were followed that meet the requirements for NI 43-101 reporting; audit assayed; volumetric calculation; 5-7 year extraction life-rectangular box indicating test area shown on map below only), ($135-$404M+/- mineral reserve; rotary drill and percussion core sampled; USBM tested; probable volumetric calculation – Per Dekalb Mining Inc.'s reserve calculation in 1982.) see footnote ¹
Projection shown below indicates the value of the mine that is expected from recalculation on the original claim area of only the partial section of our whole claim that has had up to 400 ft deep drill core verification performed on it (See yellow claim block area only indicated in the news and updates section of our website) per Dekalb Mining Inc.'s minable reserves calculation in 1982 when factoring the (0.37) Ounces Per ton of Gold / OPT AU shown in later drill core verification program's audit assay). see footnote ¹
OPT AU shown in later deep drill core verification programs: (0.37 OPT AU)
Reserve tons estimate Per Dekalb Mining Inc (1982): 2,500,000 to 7,500,000 raw ore material.
Corrected Reserves Ounces Estimate at (0.37 OPT AU) = 925,000 to 2,775,000 ounces of gold.
Net per oz after extraction costs estimate: $900.00
Low / High value per Dekalb’s mineable ore material reserves estimate = $832,500,000.00 / $2,497,500,000.00
(Gold only – not including our new 60 additional claim block)
footnote ¹: (See: Page 10 GoodMark Prospectus Brochure 9314r) “4. Dekalb Mining Inc. (1982): Surface sampling program and their study of the distribution of silicified zones showed their estimated possible and potential reserves tonnage to be 2.5 to 7.5 million tons equaling 150,000 to 450.000 oz. gold.” Referenced from Page 24 section 6.5 of 80 page total “Report On ORO GOLD PROJECT” dated November 15, 2004 by J.H. Montgomery Professional Qualified Person, PH.D, P.Eng.
Posted in: General