Does GoodMark Capital Group, Inc. have a mine?

OUR ORO GOLD MINE 75 MILES SW OF TUCSON ARIZONA

Goodmark Capital Group, Inc. (2017-2018 UPDATE): Assay and gravity concentration test of our now claimed Oro Gold Mine extended areas.  (click on link and friend us on facebkook to see our latest project development photos)–> GoodMark Capital Group,  Inc. has now claimed up 108 Claims total including our origional Oro Gold Mine and newly acquired extended area plus our Sulfide Claims to the north (Previously Known As The Idaho Mine Group) and The Choctaw Mine. (NEW TOTAL CLAIMS ACERAGE IS AS FOLLOWS: 2,189.96+15.75+18.06=2,223.78 ACRES Total / 3.48 Square Miles). Our mining crew performed assay testing that showed averages of 1.43 Ounces Of Gold Per Ton and 8.93 Ounces of Silver Per Ton in these new areas. Click on the links below to show our test results, new claim information, location maps and photographs etc.

Friend us on facebook to see latest pictures and updates https://www.facebook.com/GoodMarkCapitalGroup

Click on the links below to show our test results, new claim information, location maps and photographs etc. 1. Assay Report to Mark-1 5-27-17-r , 2. Platt Maps For Claims, 3. Numbered Claim Block Diagram , 4. Topographical Claim Block Map , 5. Our First Mill Under Construction Of The Two To Be Built This Year We Have Purchased , 6. Collage

MINE SITE 1: GoodMark Capital Group, Inc. has 108 claims Total in our Oro Gold Mine, Sulfide Gold Mine And Choctaw Gold Mine in southern Arizona. We hold the mineral rights to 2,223.78 ACRES Total / 3.48 Square Miles. GoodMark Capital Group, Inc.'s original 19 contiguous claims in the center of our mine ( 392.54 Acres )  were acquired from the original claim holders on 11-27-13 after Hellix Ventures, Inc. (HEL:TSX.V / HLLXF:OTC) that held the mineral rights to The Oro Gold Mine defaulted on their payment arrangement. ( “Hellix Drops Margarita Lease” – http://www.hellixventures.com/news/2013_sept_05.html ). We hold under a signed contract from the original claim holders the rights to 98% of the Net Smelter Revenue Earnings from all extraction of GOLD, SILVER and any other commercially producible precious metals from the center 392.54 acres of our mine.  GoodMark has added 89 additional  claims surrounding the original claim block of the Oro Gold Mine that was previously known as the Margarita Mine during the early 1900's after being claim recorded before that as the McDonald Prospect. ( Additional 1,831.24 Acres )  We hold 100 % of the mineral rights to this 1,831.24 Acres we added to the mine that brought our total  claim block to 3.48 Square Miles ( 2,223.78 Acres ).  CLICK ON LINK: ►( GoodMark BLM Current List of Arizona ORO Mining Claims ) These mining claims are held on BLM land that has been Government Tested By The United States Bureau Of Mines (USBM BM 2010 Sample Sites) and drill core verified through many extensive core sampling programs totaling 17 in the last 40 Years.  The last drill core program completed a total of twelve vertical HQ size diamond drill holes to a maximum depth of 100 feet to confirm the  past historic testing programs that have been performed on the property.  The samples were collected, selected, handled and delivered to Skyline Laboratories in Tucson, Arizona by an independent Registered Geologist in charge of the QA/QC program on this project.  Sample procedures were followed that meet the requirements for NI 43-101 reporting.  Standards and blanks were inserted at prescribed intervals in each hole as well as a second re-sample of one reject material interval from each hole.  Standards were provided from a reputable independent geochemical contractor.  We know we have gold in the ground from the audit assay drilling information we possess on this property in addition to the vast amount of additional information on the 350+ core samples that have been performed in total on the property (700+ pages total).

($100M +/­- gold reserves rotary drill core sample verified; sample procedures were followed that meet the requirements for NI 43-101 reporting; audit assayed; volumetric calculation; 5-7 ­year extraction life-rectangular box indicating test area shown on map below only), ($135-$404M+/-­ mineral reserve; rotary drill and percussion core sampled; USBM tested; probable volumetric calculation – Per Dekalb Mining Inc.'s reserve calculation in 1982.) see footnote ¹

Projection shown below indicates the value of the mine that is expected from recalculation on the original claim area of only the partial section of our whole claim that has had up to 400 ft deep drill core verification performed on it (See yellow claim block area only indicated in the news and updates section of our website) per Dekalb Mining Inc.'s minable reserves calculation in 1982 when factoring the (0.37)  Ounces Per ton of Gold / OPT AU shown in later drill core verification program's audit assay).  see footnote ¹

OPT AU shown in later deep drill core verification programs: (0.37 OPT AU)
Reserve tons estimate Per Dekalb Mining Inc (1982): 2,500,000 to 7,500,000 raw ore material.
Corrected Reserves Ounces Estimate at (0.37 OPT AU) = 925,000 to 2,775,000 ounces of gold.
Net per oz after extraction costs estimate: $900.00
Low / High value per Dekalb’s mineable ore material reserves estimate = $832,500,000.00 / $2,497,500,000.00
(Gold only – not including our new 60 additional claim block)

footnote ¹: (See: Page 10 GoodMark Prospectus Brochure 9314r) “4. Dekalb Mining Inc. (1982): Surface sampling program and their study of the distribution of silicified zones showed their estimated possible and potential reserves tonnage to be 2.5 to 7.5 million tons equaling 150,000 to 450.000 oz. gold.” Referenced from Page 24 section 6.5 of 80 page total “Report On ORO GOLD PROJECT” dated November 15, 2004 by J.H. Montgomery Professional Qualified Person, PH.D, P.Eng.

Posted in: General

Navigation

Existing Users Log In
 Remember me